In 2020 was FEST Engineering Ltd. tasked with preparing and creating of the technical documentation for an air condenser, including internal piping systems. The condenser is part of the waste incineration plant of the Bitterfeld in Germany. In addition to all stress and statics calculations, FEST provided full fabrication and assembly documentation of the condenser, including steel structure and piping. The plant has already been put into operation.
Published 08.09.2022